Ontario Septic Permit Software

Ontario Building Code · Part 8

Your septic permit package,
done right the first time.

Calculations, worksheets, drawings, setback checks and a printable 26-page package — organized the way your township expects. Built by Ontario septic people, for Ontario lots.

26pages, permit-ready
$800–2,000what designers charge
Part 8Ontario Class 4 logic

Tank = max(3,600 L, 2 × flow)
T-time = highest of 3 holes
Excavation = bed + 1 ft each side
Pipe = required × 1.20 waste
How septic happens

Six steps. This software is step five.

1Something’s wrong2What it costs3The permit4Who designs it5The paperwork6Approval

Something goes wrong. The quotes land between $25,000 and $40,000. The township says permit required. Then you find out Ontario lets homeowners design their own system on their own land. What is left is the paperwork — forms, drawings, calculations, checklists. That is the part this software prints.

Not there yet? Start with the owner-builder guide

Start where you are — the free check takes two minutes:

Who it is for

One tool, three jobs.

01 — Owner-builders

Build your own, legally

Ontario homeowners can design and build their own septic on their own land. The hard part is not buying a tank — it is proving the system fits the lot and handing the township the paperwork they expect.

Permit Package Builder

02 — Land buyers

Check before you buy

Water table, bedrock, setbacks, reserve area — the four things that make a rural lot unbuildable for septic. Check them before the offer, not after closing.

Free Septic Check

03 — Professionals

Paperwork in minutes

Enter the project once. Generate worksheets, drawings, takeoff and a client-ready PDF. Duplicate a past job and re-price it. Stop formatting forms by hand.

Part 8 Designer Pro

How it works

Answer. Check. Print.

STEP 01

Answer the questions

Bedrooms, fixtures, soil layers, T-time, water table, bedrock and setbacks — in the order a permit application asks for them.

STEP 02

The software checks it

Daily design flow, tank size, bed sizing, pass/fail setbacks, a cross-section drawing, material takeoff and cost — all computed from your inputs.

STEP 03

Print the package

A 26-page permit-ready PDF, organized the way your township or health unit expects to receive it.

Ontario Septic Designer does not issue permits. Final approval is by the local building department, health unit, or approval authority.

Proof, not promises

This is what you print.

Real pages from a sample package — failures included, because a report that never says FAIL is not checking anything.

Daily Design Flow
Bedrooms (3)1,600 L/d
Floor area add’l
Fixture units (18)OK
Final Q1,600 L/d

SAMPLE

Setback Report
Tank to wellPASS
Bed to property linePASS
Bed to dug wellFAIL
FAIL — bed is 11.2 m from a dug well. Required clearance is 30 m.

SAMPLE

Material Takeoff
Distribution pipe29 × 10 ft
Clear stone +10%14.5 yd³
Septic sand +10%22 yd³
Excavation over-dig32 × 22 ft

SAMPLE

Pricing

Start free. Build for $99.99. Go Pro when it pays.

Free Septic Check
$0
  • Estimated daily design flow
  • Estimated minimum tank size
  • Green / Yellow / Red risk level
  • Missing-information checklist

Start free

Most projects
Permit Package Builder
$99.99 / project
  • Everything in the free check
  • Worksheets, setback report, cross-section
  • Material takeoff + cost & savings
  • 26-page printable PDF package
  • 90 days · unlimited edits & exports

Build my package — $99.99

Part 8 Designer Pro
$99 / month
  • Dashboard & saved projects
  • Duplicate project for repeat jobs
  • Saved price, labour & equipment rates
  • Markups & client-ready PDF
  • Unlimited plan $149/mo

See Pro

A septic designer charges $800 to $2,000 for this paperwork. Your local authority still reviews and approves either way.

The savings argument

What owner-builders actually save.

One real bed, priced line by line the way the software does it — including the 20% pipe waste and the 1-foot over-dig on every side that supplier lists always leave out.

Costs are planning estimates only. Actual pricing depends on suppliers, trucking distance, local labour and site conditions.

Tank + delivery $4,800
Pipe + fittings $925
Clear stone $1,850
Engineered septic sand $3,600
Fabric + marker stakes $300
Pump chamber / electrical $2,500
Excavator + labour $2,560
Subtotal before HST $16,535
HST $2,149.55
Total with HST $18,684.55
Contractor quote entered $38,000
You could save $19,315

For professionals

Turn septic paperwork into a 5-minute PDF.

Enter the project once, then generate worksheets, calculations, soil profile, cross-section, takeoff and a client-ready package. Charge professional design fees. Stop formatting forms.

See Part 8 Designer Pro