Free calculator

Leaching bed calculator: how big is your bed?

Enter the house and the soil’s percolation time (T-time). Get the Ontario Building Code pipe length for a trench bed and the filter-bed area, side by side.

Every room that could be a bedroom.

Not counting a finished basement.

Leave at 0 if unsure.

From your soil test or site evaluation. Sand is often under 10, clay can be 40 or more.

Daily design flow (Q)–
Absorption trench bed: pipe length–
Laid out as–
Filter bed: filter medium area–
Fill-based bed: soil loading area, about–

Planning estimate from Ontario Building Code Part 8 (Table 8.2.1.3.A, Sentence 8.2.2.3.(1), Article 8.7.3.1, Article 8.7.5.2). It does not replace a site evaluation, and your building department or health unit has the final say.

How the leaching bed calculator works

Trench bed or filter bed: the two Ontario formulas

Trench bed (conventional). Pipe length L = Q × T ÷ 200, or Q × T ÷ 300 behind a Level II to IV treatment unit, and never less than 40 m. A conventional bed needs a T-time between 1 and 50. We split the pipe into runs of 30 m or less.

Filter bed. Sized on the filter medium: 75 L/m²/day when Q is 3,000 L or less, 50 L/m²/day above that (and then you need more than one bed), or 100 L/m²/day with a treatment unit. Each filter bed has to be between 10 and 50 m².

Soil loading area. Fill-based beds also have to spread the effluent over enough native soil: 10 L/m²/day where T is 20 or less, 8 up to 35, 6 up to 50, 4 above 50. That is the number that makes raised beds on clay so big.

Worked example: 4 bedrooms, under 200 m², T = 20 gives Q = 2,000 L/day and 2,000 × 20 ÷ 200 = 200 m of pipe, about 7 runs of 28.6 m.

Where do I get my T-time?

From a soil test: test pits and a percolation or soil-texture assessment done for your permit application. Guessing it is how beds end up the wrong size.

Why is my bed so much bigger than my neighbour’s?

Usually a higher T-time, more bedrooms or a high water table. Code minimums have also changed over the years, so an old bed is not a guide.

Does the water table change the size?

Not the length, but it changes the height. A trench bottom needs at least 900 mm above high groundwater, rock or tight soil, which is what pushes many lots to a raised bed.

Can I design and build my own bed?

Yes, for a system you own and build yourself (Ontario Building Code Division C, 3.2.5.1.(3)(d)). You still need a permit and inspections.

Want the plain-English background? Read the leaching bed guide, what T-time means and raised bed vs conventional on SepticReplacement.ca.

Want the whole picture for your lot?

The free 2-minute check adds a risk level and a missing-information list. The $99.99 + HST Permit Package Builder does the setbacks, site plan, cross-section, material list and a 20+ page package for the permit office.

Run the free check See the package ($99.99 + HST)