Owner-builders · $99.99 + HST per project

Build Your Own Septic? Start With the Paperwork.

Did you know Ontario homeowners can design and build their own septic system on their own land? The hard part is not buying a tank. The hard part is proving the system fits the lot and giving the township or health unit the paperwork they expect.

Do not pay $800 to $2,000 just to find out what the paperwork should look like.

Permit approval is always up to your local building department, health unit, or approval authority.

What you get

The 21 sections, by name (20+ printed pages).

The list IS the pitch – this is exactly what your PDF contains, in the order an approval authority expects it.

See a full sample package (PDF, 20+ pages) →

  • 1. Cover page
  • 2. Disclaimer
  • 3. Project summary
  • 4. Owner / applicant information
  • 5. Property information
  • 6. Daily design flow worksheet
  • 7. Fixture unit worksheet
  • 8. Septic tank sizing worksheet
  • 9. T-time summary
  • 10. Soil / test-hole logs
  • 11. System option calculation
  • 12. Setback report
  • 13. Site plan overlay
  • 14. Cross-section drawing
  • 15. Material takeoff
  • 16. Cost estimate
  • 17. Owner-builder savings estimate
  • 18. Pump chamber notes
  • 19. Missing-information checklist
  • 20. Township / health-unit submission checklist
  • 21. Signature / review page
The legal question

Is it legal to design my own septic system in Ontario?

Yes, for your own system on your own property. The Ontario Building Code normally requires a septic designer to hold a BCIN (provincial designer registration), but Division C, Sentence 3.2.5.1.(3), clause (d) exempts a person whose design work is only for a sewage system that the person will build and that the person owns. In plain terms: design it, own it, build it, and you do not need a BCIN. You still need a sewage system permit from your township, health unit or conservation authority, the design still has to meet Part 8, and the inspector still checks the work. Some township web pages only mention BCIN designers; if the counter clerk asks, point them to Div. C 3.2.5.1.(3)(d).

How it works

Six steps, in permit order.

Move freely between steps. Your work saves automatically on your device. Flows over 10,000 L/day stop with an out-of-scope notice.

STEP 01Site plan – upload your survey or aerial photo (JPG, PNG or PDF) and set the scale, or start on a blank scaled sheet drawn from your lot dimensions if you have no drawing; then trace your lot lines, buildings and wells
STEP 02Property – project type, owner, address, lot and roll number, township – and your approval authority, filled in for you where we know your township
STEP 03House – bedrooms, floor area and fixture units for the Part 8 daily design flow, plus the septic tank you plan to install
STEP 04Soil – three T-time entries (highest governs), depth to water and bedrock, and repeatable test-hole cards with the soil layers you saw
STEP 05Results – flow, tank minimum checked against your tank, bed sizing, trench or filter bed (in-ground or raised – your choice or ours), cross-section, takeoff, cost and warnings
STEP 06Place + Print – place the bed and tank on your plan with live pass/fail setbacks, then print the PDF package as often as you like during your 90 days
Access terms, plainly

One payment. One project. 90 days.

$99.99 + HST covers one project – unlimited edits and unlimited PDF exports for 90 days. A second project is a second $99.99 + HST.

Need longer? Email us before your 90 days end: 30-day extension $19.99 + HST, 90-day extension $39.99 + HST, reactivation after expiry $29.99 + HST. Your answers and site plan save automatically in your browser on the device you use, and you can download a backup file to move to another computer.

Refunds: all sales are final, so look through the sample package first. The policy, in plain words.

The savings argument

What owner-builders actually save.

One real bed, priced line by line the way the software does it – including the 20% pipe waste and the 1-foot over-dig on every side that supplier lists always leave out.

Costs are planning estimates only. Actual pricing depends on suppliers, trucking distance, local labour and site conditions.

Tank + delivery $4,800
Pipe + fittings $925
Clear stone $1,850
Engineered septic sand $3,600
Fabric + marker stakes $300
Pump chamber / electrical $2,500
Excavator + labour $2,560
Subtotal before HST $16,535
HST $2,149.55
Total with HST $18,684.55
Contractor quote entered $38,000
You could save $19,315
Questions

Before you buy.

Is this a permit?

No. The authority approves. This is the complete, organized package you hand them – calculations, drawings, worksheets and checklists prepared from your inputs.

What systems does it cover at launch?

Residential Class 4: conventional absorption trench, filter bed, and raised versions of both. Systems over 10,000 L/day and commercial projects are out of scope.

What if my lot has a high water table or bedrock?

The software flags it, calculates the raised-bed option as far as Part 8 allows, and marks anything that needs confirmation with your approval authority.

Can I edit after exporting?

Yes – unlimited edits and unlimited exports for your whole 90-day access. Fix a number, re-export, hand in the new version.

Refunds?

All sales are final. It is a single-project digital product, so run the free check and look through the sample package before you buy. Refund policy.

Build My Permit Package — $99.99 + HST

Permit approval is always up to your local building department, health unit, or approval authority.