Ontario Septic Designer
Septic tank size calculator for Ontario homes.
Three numbers in, the Ontario Building Code minimums out: daily design flow, minimum tank size and compartment sizes. No email needed.
Planning estimate from Ontario Building Code Part 8 (Table 8.2.1.3.A, Sentence 8.2.2.3.(1), Article 8.7.3.1, Article 8.7.5.2). It does not replace a site evaluation, and your building department or health unit has the final say.
The rules behind the numbers
Step 1, daily design flow. Ontario sets a flow by bedrooms: 750 L/day for 1 bedroom, 1,100 for 2, 1,600 for 3, 2,000 for 4 and 2,500 for 5. Then you add the largest of three extras: 500 L for each bedroom over 5, extra for finished area over 200 m² (100 L for each 10 m², or part of it, up to 400 m²; 75 L up to 600 m²; 50 L beyond), or 50 L for each fixture unit over 20.
Step 2, the tank. The minimum working capacity is twice the daily design flow, but never less than 3,600 L. The first compartment has to hold at least 1.3 times the daily flow (and never less than 2,400 L), and the second at least half of the first.
So a 4-bedroom house under 200 m² comes out at 2,000 L/day and a 4,000 L tank. Add a big finished area and the flow goes up, and so does the tank.
Can I use a bigger tank than the minimum?
Yes. Bigger is allowed and it gives solids more time to settle. The extra cost is usually small next to the cost of the bed.
Does a finished basement count?
Not toward the floor-area extra. But a basement bedroom still counts as a bedroom.
What tank size does a 3-bedroom house need?
At under 200 m² of finished area, 1,600 L/day of flow, so the 3,600 L minimum applies.
Is this the whole design?
No. The tank is the easy part. The leaching bed, setbacks and soil decide most of the cost. Try the leaching bed calculator next.
Want the plain-English background? Read the septic tank size guide and what a tank replacement costs on SepticReplacement.ca.
Want the whole picture for your lot?
The free 2-minute check adds a risk level and a missing-information list. The $99.99 + HST Permit Package Builder does the setbacks, site plan, cross-section, material list and a 20+ page package for the permit office.